Aviation Project & Airport Operation (Modules From Advanced Diploma In Aviation Operations And Management) - School Of Professional And Continuing Education, Hku
課程名稱: |
Aviation Project & Airport Operation (Modules From Advanced Diploma In Aviation Operations And Management) - School Of Professional And Continuing Education, Hku |
---|---|
院校名稱: |
香港大學專業進修學院 |
課程編號: |
33Z105717 |
範疇: |
商業及管理 |
上課模式: |
54 HOURS, PT |
為期: |
8 MONTHS |
學費: |
5,870.00 |
入學要求: |
Applicant Shall Have 1. (A) (I) Have Gained Three Passes In Hkcee Including Mathematics Plus Level 2 Or Above In Chinese Language And English Language, Or Five Passes In The Pre 2007 Hkcee (Including Chinese Language, English Language* And Mathematics); And (Ii) Have Three Years Of Relevant Work Experience Or (B) (I) Have Gained In The Hkale Grade E In One Al Subject Or Two As Subjects; And (Ii) Have One Year Of Work Experience Or (C) (I) Have Gained In The Hkdse Examination** Level 2 Or Above In Five Subjects Including Chinese Language, English Language And Mathematics; And (Ii) Have Two Years Of Work Experience And 2. Be Aged 21 Or Above Applicants With Other Equivalent Qualifications And Relevant Work Experience Will Be Considered On Individual Merit. Remarks: * Grade C In The Case Of English Language (Syllabus A). ** Applicants Are Allowed To Use Not More Than Two Applied Learning (Apl) Subjects In The Application. The Recognition Of The Apl Subjects Is As Follows:Before 2018 Hkdse Examination - “Attained With Distinction” Is Deemed Equivalent To Level 3; And - 'Attained' Is Deemed Equivalent To Level 2 2018 Hkdse Examination Or Afterward - “Attained With Distinction (Ii)” Is Deemed Equivalent To Level 4; And - “Attained With Distinction (I)” Is Deemed Equivalent To Level 3; And - 'Attained' Is Deemed Equivalent To Level 2 |
課程大綱: |
A) Aviation Project (Lecture: 18 Hours & Tutorial: 9 Hours) 1) Students Will Be Required To Complete A Project In A Group Of Around 3-4 Students. 2) Each Project Group Has To Operate A Virtual Airline On Software Simulated Platform. 3) Presentations And Reports Will Be Required At Various Stages Of The Project. 4) A Project Report Together With Appropriate Deliverables Should Be Submitted. B) Airport Operation (27 Hours) 1) Airport Design And Infrastructure (4.5 Hours) 2) Airport Landside Operations (4.5 Hours) 3) Airport Airside Operations (4.5 Hours) 4) Airline Operations In Airport (4.5 Hours) 5) Introduction To Air Traffic Congestion (4.5 Hours) 6) Third Runway Of Hong Kong International Airport (4.5 Hours) |
資歷名冊登記號碼: |
12/001151/4 |
資歷架構級別: |
4 |